Sunday, October 11, 2009

Tired

I don't know when I've ever been so tired. P had surgery on Monday and her right hand is in a big old cast. She's not much use around here right now. So, in the interest of domestic peace, I sent her to Lake Gaston to spent the weekend with friends. I spent Friday night dusting down the front room. Used an entire box of swiffer wipes on that room along. Saturday, I was here by 9 and spent the day dusting the rest of the upstairs. Had some hired help for a couple of hours which helped. T washed down the floors and vacuumed the stairs. I dusted part of the downstairs before quitting and heading back to the Springs. Stopped at 5 Guys (damn they have good burgers) for dinner. Went home, showered and fell into bed at 7 PM. Was up at 6:30 this morning and at the house by 8. Spent the first part of the morning cleaning up. Washed all the dishes, the countertops and did some general de-dusting. Then finished de-dusting the downstairs. Cracked open the primer around 1ish and started priming. Got the master bedroom primed to where I can reach. I don't have the energy to pull the ladder up the stairs just now. Started priming the bathroom when my hand just gave out. Decided to take a break and try and get a post in.

Taking pictures of people washing floors or dusting walls is pretty uninteresting. So, no pictures today. Maybe after priming has happened.

Sunday, October 4, 2009

Walls, At Last!

We have walls, I tell you! We have walls! Plaster guys were here all last week working upstairs putting in drywall and repairing/skim coating the plaster and I have to say, it looks beautiful! So white and clean.


First the guest bedroom:




The Hallway and Bathroom:



The drywall guys said we were going to have to pull down all the plaster in the bathroom because it was so deteriorated due to the leaking skylight. Penny started to go up and work on that on Wednesday (her day off). The guys looked at her and asked if she was going to do it now. As she is having hand surgery on Monday, Wednesday was going to be the only opportunity for her to get the plaster down. I think her pitiful hand made him feel bad so he agreed to laminate the old plaster with new drywall and box in the opening for the medicine cabinet too!

Master Bedroom:




So, what's left?

Downstairs skimcoating/plaster repair has to be finished.
Electrical is wrapping up.
Need to install sink in golden bath.
Skylight has to be fixed as it still leaks.
Downspouts need to be installed.
Need to get a new stove/range as now both the stove and the oven have crapped out on me.
Need to dust and then prime.
Then we get to call in the floor folks to fix and refinish the floors.
THEN we get to move in. I'm still hoping for November 1, but I'm thinking that is going to be pushing it. We'll see.

It won't be perfectly completed, but it will be livable. We are hoping we will be able to put in the powder room downstairs now too. It would be nice to have a house that has two toilets.